Year

Projects

2026 – Present

  • Project: COVA Storage Tanks. Contractor / Employer: Rendelin, Cercola (NA), Italy.
Supervised activities: Coatings application & Internal lining.
Place: “Centro Oli Val D’Agri”, Viggiano (PZ), Italy. Final Client: Eni

2025 – Present

  • Projects: Uaru and Whiptail Subsea Projects for Exxon; Neptun Jacket for OMV Petrom. Contractor / Employer: Rendelin, Cercola (NA), Italy. Supervised activities: Coatings application. Place: Saipem Yard, Arbatax (OG), Italy.

2019 – Present

  • Project: Process Modules for Calcasieu Pass 1 & 2 and Plaquemines LNG Plants. Contractor / Employer: Baker Hughes, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plants, San Giorgio di Nogaro (UD) and Monfalcone (GO); RAM Power Plants, Ravenna; Metal Carpenteria, Crotone; Donelli, Cuggiono (MI); Bcube Livorno; Baker Hughes Plant, Avenza (MS), Italy. Final Client: Venture Global

2018 – 2021

  • Project: JFJV Turbo-Compressor Modules for LNG Canada Project. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation & Preservation Place: Cimolai Plants, San Giorgio di Nogaro (UD); BH Yard, Avenza (MS), Italy. Final Client: LNG Canada Development inc. 

2019 – 2021

  • Project: Process Modules for Calcasieu Pass LNG Plant. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plants, San Giorgio di Nogaro (UD) and Monfalcone (GO); RAM Power Plants, Ravenna; Donelli, Cuggiono (MI); Bcube Livorno; BH Yard, Avenza (MS), Italy. Final Client: Venture Global

2018 – 2021

  • Project: COVA Storage Tanks. Contractor / Employer: Metalcovering, Briatico (VV), Italy.
    Supervised activities: Coatings application & Internal lining.
    Place: “Centro Oli Val D’Agri”, Viggiano (PZ), Italy. Final Client: Eni

2017 – 2021

  • Project: Various. Contractor / Employer: Bcube Plants, Firenze, Massa, Bari, Italy. Supervised activities: Coatings application Place: Bcube Plants, Firenze, Massa, Bari, Italy. Final Client: Various

2019 – 2020

 

  • Project: WHRU Module and Auxiliary System Support Structure for LM2500+G4 Gas Turbine for “Castberg” Project. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application Place: BH Plants, Massa; BH Yard, Avenza (MS), Italy. Final Client: Equinor

2018 – 2020

  • Project: “Coral” Project – Construction of Subsea Distribution Units and Manifolds. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application & Preservation. Place: RAM Plants, Sant’Alberto (RA); BH Yard, Avenza (MS), Italy. Final Client: Eni Mozambique

2015 – 2019

  • Project: Frame 9 Gas Turbine Generator Modules A to E for Project Tengiz Future Growth, Kazakhstan. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plant, San Giorgio di Nogaro (UD); OMA Plants, Tocco da Casauria (PE); GE/BH Plant, Vibo Valentia & GE/BH Yard, Avenza (MS), Italy. Final Client: TCO

2013 – 2019

  • Project: Block 15/06 West Hub Development – Construction of Subsea Distribution Units and Manifolds. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, QA / QC & Preservation. Place: OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Eni Angola

2017

  • Project: Carbon Steel Motor Cooling Units, Oman.  Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application. Place: Savep Plant, Povoletto (UD), Italy. Final Client: Petroleum Development Oman

2016 – 2017

  • Project: Valves for Umm-Lulu Off-Shore Project, Abu Dhabi, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Thermal spraying. Place: Various Suppliers in Italy. Final Client: ADMA-OPCO

2016 – 2017

  • Project: Various components for NASR Phase II Project, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application. Place: Various Suppliers in Italy and Europe. Final Client: ADMA-OPCO

2015 – 2017

  • Project: GTG Modules A to G for Zadco UZ-750 EPC2 Project, Abu Dhabi, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation & Preservation. Place: Cimolai Plant, San Giorgio di Nogaro (UD), OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Petrofac DSME

2014 – 2017

  • Project: Vessels and Drums for various projects: 
    1. Wheatstone, Australia;
    2. Marinsky Refinery, Russia;
    3. Turkmengas, Turkmenistan;
    4. Methanol Plant, Iran;
    5. Copler Sulfide Expansion Project, Turkey.
    Contractor / Employer: Carpenteria Corsi, Castelnuovo Magra (SP), Italy. Supervised activities: Coatings application, Insulation & Preservation. Place: Carpenteria Corsi Plant, Massa, Italy. Final Client: Chevron Australia| Total Oil LLC| Kawasaki| Marjan | Foster Wheeler

2013 – 2017

  • Project: Block 15/06 West Hub Development – SDU (Subsea Distribution Unit) and Manifold. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application, QA / QC & Preservation. Place: OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Eni Angola.

2016

  • Project: Filter Houses for Ain Dar and Al Khurais Projects. Contractor / Employer: Tallarini, Sant’Ippolito (PU), Italy. Supervised activities: Coatings application. Place: Tallarini Plants, Orciano (PU), Italy. Final Client: Saudi Aramco

2016

  • Project: Myingyan 225MW Combined Cycle Power Plant, Myanmar. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Toshiba-Mitsubishi Plant, Nagasaki, Japan. Final Client: SembCorp Utilities Pte Ltd.

2014 – 2016

  • Project: Piping and components for various projects. Contractor / Employer: Metallurgica TM, Massa, Italy. Supervised activities: Coatings application. Place: Metallurgica TM Plants, Massa, Italy. Final Client: Nuovo Pignone GE Oil & Gas

2014 – 2016

  • Project: Cooler Headers and various components. Contractor / Employer: SMIVA, Milan, Italy.Supervised activities: Coatings application. Place: SMIVA Plants, Vibo Valentia, Italy.
  • Final Client: Nuovo Pignone GE Oil & Gas

2013 – 2016

  • Project: Components for Various Projects. Contractor / Employer: Tecnomec Engineering, Grumo Appula (BA), Italy. Supervised activities:Coatings application. Place: Tecnomec Plant, Grumo Appula (BA) and Taranto, Italy. Final Client: Various

2015

  • Project: GDX System M.A.D. – Filter Houses. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities:Coatings application. Place:  Donaldson Plants, Abu Dhabi, UAE. Final Client: Nuovo Pignone GE Oil & Gas.

2015

  • Project: Compressors painting repairs. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities:Coatings application. Place: Bechtel Sabine Pass LNG Plant, Louisiana, USA Final Client: Cheniere Energy

2015

  • Project: Piping for Tempa Rossa Project. Contractor / Employer: Donelli EOS, Ravenna, Italy. Supervised activities:Coatings application. Place: Aspis Plants, Brindisi, Italy Final Client: Total EP Italia

2014

  • Project: Various components for Prelude Project. Contractor / Employer: 437 Srl, Bergamo, Italy. Supervised activities:Coatings application. Place: Various Suppliers in Italy and Europe.
    Final Client: Shell. 

2014

  • Project: Components and skids for various projects. Contractor / Employer: Bcube, Coniolo (AL), Italy. Supervised activities:Coatings application. Place: Bcube Massa and Livorno Plants, Italy
    Final Client: Nuovo Pignone GE Oil & Gas.

2013 – 2014

  • Project: Bukom ECG Cogen Project – Singapore. Contractor / Employer: Leucci, Brindisi, Italy. Supervised activities:Thermal spraying.Place: TSM Plants, Brindisi, Italy. Final Client: Shell Eastern Petroleum Ltd.

2011 – 2014

  • Project: Gorgon Project Barrow Island LNG Plant – Fully Modularised Gas Turbine Generators. Modules 4001 to 4005. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Quarantine, Coatings application, QA / QC & Preservation. Place: NP Yard, Avenza (MS), Italy. Final Client: Chevron Australia.

2013

  • Project: H2S Production Tanks. Contractor / Employer: 437 Srl, Bergamo, Italy. Supervised activities: Internal lining. Place: APM Facilities, Fier, Albania. Final Client: Petromanas Energy Inc. Canada.

2012 – 2013

  • Project: Total E&P UK Laggan-Tormore Project. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: NP Yard, Avenza (MS), Italy. Final Client: Total EP UK

2010 – 2012

  • Project: Gorgon Project Barrow Island LNG Plant – Fully Modularised Gas Turbine Generators. Modules 4001 to 4005. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Navalmare Yard, La Spezia, Italy. Final Client: Chevron Australia.

2011

  • Project: Gorgon Project Barrow Island LNG Plant – Jetty. Contractor / Employer: Saipem, Milan, Italy. Supervised activities: Coatings application. Place: PT Hanjung, Lampung, Indonesia. Final Client: KJVG.

2010 – 2011

  • Project: Capparuccia. Contractor / Employer: Demont, Millesimo (SV), Italy.
    Supervised activities: Coatings application. Place: SA.V.IN., Castel dell’Aquila (TR), Italy. Final Client: Eni.

2010

  • Project: USAN Deepwater Project – Top and Bottom Assembly.
    Contractor / Employer: Saipem Energy Services, Arbatax (OG), Italy. Supervised activities: Coatings application. Place: S.E.S. Yard, Arbatax (OG), Italy. Final Client: Total.

2010

  • Project: Bonaccia Est  – Field joint. Contractor / Employer: IET, Genoa, Italy. Supervised activities: Piping rubber coating. Place: Micoperi MC – Adriatic See, Italy. Final Client: Eni. 

2010

  • Project: Capparuccia. Contractor / Employer: IET, Genoa, Italy. Supervised activities: Piping rubber coating. Place: Riveco, Larino (CB), Italy. Final Client: Eni. 

2010

  • Project: Heat Recoivery Steam Generator. Contractor / Employer: Impresa Donelli, Legnano, Italy. Supervised activities: Coatings application. Place: Gönyü Power Plant, Hungary. Final Client: EON. 

2009 – 2010

  • Project: 72 Headers (36 bundles) . Contractor / Employer: OLMI, Bergamo, Italy. Supervised activities: Coatings application & Thermal spraying. Place: TDM Plants, Vibo Valentia, Italy. Final Client: UHDE – Suiskil. 

2005 – 2010

  • Project: RGI Modules 1 and 2 for Kashagan Experimantal Project, Kazakhstan.
    Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application, Tank lining, Fireproofing & Insulation. Place: Navalmare Yard, La  Spezia, Italy. Final Client: AGIP KCO.

2009

  • Project: Package quality verification.
    Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: LNG Pampa Melchorita, Peru. Final Client: Nuovo Pignone GE Oil & Gas.

2009

  • Project: S 355 C2 Stinger. Contractor / Employer: Nuova Olmec, Arcola (SP), Italy. Supervised activities: Coatings application. Place: Navalmare Yard,  La Spezia, Italy. Final Client: Saipem.

2009

  • Project: 2 Fluid Bed Cooler Casings e Granulator for Qafco-5. Contractor / Employer: Cemit, Taranto, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: Qatar Gas.

2008

  • Project: Plant and Applicators quality verification. Contractor / Employer: OMA/Henson, Bucharest, Romania. Supervised activities: Coatings application. Place: Metacom Yard, Costanta, Romania. Final Client: OMA/Henson.

2008

  • Project: GTG – Qatar Gas II. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy.
    Supervised activities: Coatings application. Place: Ras Laffan Industrial City, Qatar Final Client: Qatar Gas.

2008

  • Project: Scarabeo 8. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
    Supervised activities: Coatings application. Place: Navalmare Yard, La Spezia, Italy
    Final Client: Saipem.

2007 – 2008

  • Project: Mega Yacht Serena. Contractor / Employer: BOAT, Genoa, Italy.
    Supervised activities: Coatings application & Tank lining. Place: Fincantieri Plants, La Spezia, Italy.
    Final Client: Fincantieri.

2006 – 2007

  • Project: 310, 320 and 330 Modules for Adriatic LNG Project. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: NP Yard, Avenza (MS), Italy;  Dragados Yard, Cadiz, Spain. Final Client: Exxon Mobil.

2006 – 2007

  • Project: Filter House for Khurais Project, Saudi Arabia. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application & Tank lining. Place: Tallarini Plants, S. Ippolito (PU), Italy. Final Client: Saudi Aramco.

2006 – 2007

  • Project: Woodside Phase V LNG. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Wooddide LNG, Karratha WA, Australia.
    Final Client: Foster Wheeler Worley Parsons.

2005 – 2007

  • Project: Tanks and vessels for Sabratha platform. Contractor / Employer: SICES, Porto Torres (SS), Italy. Supervised activities: Coatings application. Place: SICES Plants, Porto Torres (SS), Italy. Final Client: AGIP KCO.

2005

  • Project: Module for Petrobras P34  FPSO. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: BR.

2005

  • Project: Piping for Petrobras P54. Contractor / Employer: Cemit, Taranto, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: BR.

2005

  • Project: Sable Tier II Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
    Supervised activities: Coatings application & Thermal spraying. Place: SVM Yard, Taranto, Italy . Final Client: Exxon Mobil.

2004 – 2005

  • Project: Sable Tier II Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
    Supervised activities: Coatings application & Thermal spraying. Place: Intermare  Sarda Yard, Arbatax (NU), Italy. Final Client: Exxon Mobil.

2004 – 2005

  • Project: West Espoir Jacket and Deck. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
    Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy. Final Client: CNR International. 

2004

  • Project: Piping for Beregovaja Comprassion Station, Russia. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy. Final Client: Saipem.

2004

  • Project: East Area EPC2 – Modules GR1, GR2 e GR3. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy. Final Client: Exxon Mobil.

2004

  • Project: Offshore oil traps. Contractor / Employer: C.I.B., Viggiano (PZ), Italy.
    Supervised activities: Coatings application. Place: C.I.B. Yard, Viggiano (PZ), Italy. Final Client: AGIP.

2003 – 2004

  • Project: Piping for Petrobras P50. Contractor / Employer: Cemit, Taranto, Italy.
    Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy.
    Final Client: BR.

2003 – 2004

  • Project: Sabratha Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
    Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy.
    Final Client: AGIP Gas BV.

2003 – 2004

  • Project: Modules P05A and P05B for Petrobras P50 FPSO. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application & Thermal spraying.
    Place: Nuovo Pignone Yard, Avenza (MS), Italy. Final Client:  BR.

2003 – 2004

  • Project: Structures for WAFA Coastal Gas Plant, Libya. Contractor / Employer: ICOM Engineering, Padova, Italy.  Supervised activities: Coatings application. Place: TSM Plants, Brindisi, Italy.
     Final Client: AGIP.

2002 – 2003

  • Project: Modules LP96 and LP97 for Ampa Fairley Phase 2.. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Nuovo Pignone Yard, Avenza (MS), Italy. Final Client: Shell Brunei.

2003

  • Project: Package for Sabratha Platform. Contractor / Employer: SICES, Porto Torres (SS), Italy.
    Supervised activities: Coatings application. Place: SICES Plants, Porto Torres (SS), Italy.
    Final Client: AGIP Gas BV.

2003

  • Project: Structures for WAFA Coastal Gas Plant, Libya. Contractor / Employer: ISG, Milano, Italy. Supervised activities: Coatings application. Place: Various Yards in Italy. Final Client: AGIP.

2002

  • Project: Verification of application standards. Contractor / Employer: Volga International, Genoa, Italy. Supervised activities: Coatings application. Place: Vietsovpetro Plants, Vung Tau, Vietnam. Final Client: Volga International.

2002

  • Project: Storage Tanks in  ASAB Plant. Contractor / Employer: Snamprogetti, Milan, Italy. Supervised activities: Tank lining. Place: ASAB Gas Plant, Abu Dhabi, UAE. Final Client: ADNOC.

2002

  • Project: Modules P05A and P05B for Petrobras P50 FPSO. Contractor / Employer: Snamprogetti, Milan, Italy. Supervised activities: Coatings application. Place: Sidermontaggi Yard, Taranto.  Final Client: BR.

2002

  • Project: Verification of RoRo Maltese Falcon. Contractor / Employer: Sea Malta Company, Malta. Supervised activities: Coatings application. Place: Drydocks, Marsa, Malta. Final Client: Sea Malta Company.

2000 – 2002

  • Project: Oiltanking Malta Tank farm. Contractor / Employer: Oiltanking Malta, Malta. Supervised activities: Coatings application & Tank lining. Place: B’Bugia Freeport, Malta. Final Client: Oiltanking Malta.

2001

  • Project: Verification of Foukanda and Mwafi Decks. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: AGIP Offshore Fields, Congo. Final Client: AGIP Congo.

2000 – 2001

  • Project: Foukanda and Mwafi Decks.  Contractor / Employer:  SVM, Tortolì (NU), Italy. Supervised activities: Coatings application. Place: IntermareSarda Yard, Arbatax (NU), Italy. Final Client: AGIP Congo.

2000

  • Project: Sewage Water Treatment Plant. Contractor / Employer:  Gemmo Impianti, Vicenza, Italy.
    Supervised activities: Tank lining. Place: NATO Base, La Maddalena (SS), Italy.
    Final Client: NATO.

1999 – 2000

  • Project: Vessels for Riyadh-Qassim WTS/St. 4. Contractor / Employer: Tuboveritas, Milan, Italy. Supervised activities: Coatings application & Tank lining. Place: TSM Plants, Brindisi, Italy. Final Client: SSWCC.

1998 – 1999

  • Project: Bouri Phase 2 – USV-Skid. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy.
    Final Client: AGIP.

1998 – 1999

  • Project: Annalisa Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare  Sarda Yard, Arbatax (NU), Italy.
    Final Client: AGIP.

1998 – 1999

  • Project: Åsgard B TLP – Module M20. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application, Fireproofing & Insulation. Place: Intermare  Sarda Yard, Arbatax (NU), Italy. Final Client: Statoil. 

1998

  • Project: Marlin TLP. Contractor / Employer: SMT, Massafra (TA) Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Amoco. 

1996 – 1998

  • Project: Ursa TLP. Contractor / Employer: Belleli, Mantova, Italy.  Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.

1997

  • Project: Modules P15, P16, P35 and P36 for Åsgard A FPSO. Contractor / Employer: Belleli Offshore, Taranto, Italy.  Supervised activities: Coatings application & Thermal spraying . Place: Belleli Plants, Siracusa, Italy. Final Client: Statoil.

1993 – 1997

  • Project: Flue Gas Desulphuration Plant for ENEL Brindisi Sud. Contractor / Employer: APSA, Milan, Italy.  Supervised activities: Coatings application & Mat lining. Place: ENEL Power Station, Brindisi Final Client: ENEL.

1995 – 1996

  • Project: Storebaelt Bridge. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy.
     Final Client: Coinfra.

1995 – 1996

  • Project: Ram/Powell TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.

1994 – 1995

  • Project: Njord TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Aker.

1994 – 1995

  • Project: Mars TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.

1993 – 1994

  • Project: Modules M30 and M40 for Hibernia Platform. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Hibernia.

1991 – 1993

  • Project: Auger TLP. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.

1991 – 1992

  • Project: Modules for Scott Field. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Amerada-Hess.

1989 – 1990

  • Project: Snorre TLP. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Statoil.

1989

  • Project: Olimpico Stadium covering structures. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Belleli.

1988

  • Project: Meazza Stadium covering structures. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Belleli.

1987 – 1988

  • Project: Agbara Jacket, Deck and Flare. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Saipem.

1987 – 1988

  • Project: Modules M16 and M17 for Gullfaks C Platform. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application &  Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Statoil.

1986 – 1987

  • Project: DP-3 Jacket and Flare. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: AGIP.

1985 – 1986

  • Project: DP-4 Jacket. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: AGIP.