Year
Projects
2026 – Present
- Project: COVA Storage Tanks. Contractor / Employer: Rendelin, Cercola (NA), Italy. Supervised activities: Coatings application & Internal lining. Place: “Centro Oli Val D’Agri”, Viggiano (PZ), Italy. Final Client: Eni
2025 – Present
- Projects: Uaru and Whiptail Subsea Projects for Exxon; Neptun Jacket for OMV Petrom. Contractor / Employer: Rendelin, Cercola (NA), Italy. Supervised activities: Coatings application. Place: Saipem Yard, Arbatax (OG), Italy.
2019 – Present
- Project: Process Modules for Calcasieu Pass 1 & 2 and Plaquemines LNG Plants. Contractor / Employer: Baker Hughes, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plants, San Giorgio di Nogaro (UD) and Monfalcone (GO); RAM Power Plants, Ravenna; Metal Carpenteria, Crotone; Donelli, Cuggiono (MI); Bcube Livorno; Baker Hughes Plant, Avenza (MS), Italy. Final Client: Venture Global
2018 – 2021
- Project: JFJV Turbo-Compressor Modules for LNG Canada Project. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation & Preservation Place: Cimolai Plants, San Giorgio di Nogaro (UD); BH Yard, Avenza (MS), Italy. Final Client: LNG Canada Development inc.
2019 – 2021
- Project: Process Modules for Calcasieu Pass LNG Plant. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plants, San Giorgio di Nogaro (UD) and Monfalcone (GO); RAM Power Plants, Ravenna; Donelli, Cuggiono (MI); Bcube Livorno; BH Yard, Avenza (MS), Italy. Final Client: Venture Global
2018 – 2021
- Project: COVA Storage Tanks. Contractor / Employer: Metalcovering, Briatico (VV), Italy.
Supervised activities: Coatings application & Internal lining.
Place: “Centro Oli Val D’Agri”, Viggiano (PZ), Italy. Final Client: Eni
2017 – 2021
- Project: Various. Contractor / Employer: Bcube Plants, Firenze, Massa, Bari, Italy. Supervised activities: Coatings application Place: Bcube Plants, Firenze, Massa, Bari, Italy. Final Client: Various
2019 – 2020
- Project: WHRU Module and Auxiliary System Support Structure for LM2500+G4 Gas Turbine for “Castberg” Project. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application Place: BH Plants, Massa; BH Yard, Avenza (MS), Italy. Final Client: Equinor
2018 – 2020
- Project: “Coral” Project – Construction of Subsea Distribution Units and Manifolds. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application & Preservation. Place: RAM Plants, Sant’Alberto (RA); BH Yard, Avenza (MS), Italy. Final Client: Eni Mozambique
2015 – 2019
- Project: Frame 9 Gas Turbine Generator Modules A to E for Project Tengiz Future Growth, Kazakhstan. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation, Fire Proofing & Preservation. Place: Cimolai Plant, San Giorgio di Nogaro (UD); OMA Plants, Tocco da Casauria (PE); GE/BH Plant, Vibo Valentia & GE/BH Yard, Avenza (MS), Italy. Final Client: TCO
2013 – 2019
- Project: Block 15/06 West Hub Development – Construction of Subsea Distribution Units and Manifolds. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, QA / QC & Preservation. Place: OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Eni Angola
2017
- Project: Carbon Steel Motor Cooling Units, Oman. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application. Place: Savep Plant, Povoletto (UD), Italy. Final Client: Petroleum Development Oman
2016 – 2017
- Project: Valves for Umm-Lulu Off-Shore Project, Abu Dhabi, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Thermal spraying. Place: Various Suppliers in Italy. Final Client: ADMA-OPCO
2016 – 2017
- Project: Various components for NASR Phase II Project, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application. Place: Various Suppliers in Italy and Europe. Final Client: ADMA-OPCO
2015 – 2017
- Project: GTG Modules A to G for Zadco UZ-750 EPC2 Project, Abu Dhabi, UAE. Contractor / Employer: Nuovo Pignone BH, Florence, Italy. Supervised activities: Coatings application, Insulation & Preservation. Place: Cimolai Plant, San Giorgio di Nogaro (UD), OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Petrofac DSME
2014 – 2017
- Project: Vessels and Drums for various projects:
- Wheatstone, Australia;
- Marinsky Refinery, Russia;
- Turkmengas, Turkmenistan;
- Methanol Plant, Iran;
- Copler Sulfide Expansion Project, Turkey.
2013 – 2017
- Project: Block 15/06 West Hub Development – SDU (Subsea Distribution Unit) and Manifold. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application, QA / QC & Preservation. Place: OMA Plants, Tocco da Casauria (PE); GE Yard, Avenza (MS), Italy. Final Client: Eni Angola.
2016
- Project: Filter Houses for Ain Dar and Al Khurais Projects. Contractor / Employer: Tallarini, Sant’Ippolito (PU), Italy. Supervised activities: Coatings application. Place: Tallarini Plants, Orciano (PU), Italy. Final Client: Saudi Aramco
2016
- Project: Myingyan 225MW Combined Cycle Power Plant, Myanmar. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Toshiba-Mitsubishi Plant, Nagasaki, Japan. Final Client: SembCorp Utilities Pte Ltd.
2014 – 2016
- Project: Piping and components for various projects. Contractor / Employer: Metallurgica TM, Massa, Italy. Supervised activities: Coatings application. Place: Metallurgica TM Plants, Massa, Italy. Final Client: Nuovo Pignone GE Oil & Gas
2014 – 2016
- Project: Cooler Headers and various components. Contractor / Employer: SMIVA, Milan, Italy.Supervised activities: Coatings application. Place: SMIVA Plants, Vibo Valentia, Italy.
- Final Client: Nuovo Pignone GE Oil & Gas
2013 – 2016
- Project: Components for Various Projects. Contractor / Employer: Tecnomec Engineering, Grumo Appula (BA), Italy. Supervised activities:Coatings application. Place: Tecnomec Plant, Grumo Appula (BA) and Taranto, Italy. Final Client: Various
2015
- Project: GDX System M.A.D. – Filter Houses. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities:Coatings application. Place: Donaldson Plants, Abu Dhabi, UAE. Final Client: Nuovo Pignone GE Oil & Gas.
2015
- Project: Compressors painting repairs. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities:Coatings application. Place: Bechtel Sabine Pass LNG Plant, Louisiana, USA Final Client: Cheniere Energy
2015
- Project: Piping for Tempa Rossa Project. Contractor / Employer: Donelli EOS, Ravenna, Italy. Supervised activities:Coatings application. Place: Aspis Plants, Brindisi, Italy Final Client: Total EP Italia
2014
- Project: Various components for Prelude Project. Contractor / Employer: 437 Srl, Bergamo, Italy. Supervised activities:Coatings application. Place: Various Suppliers in Italy and Europe.
Final Client: Shell.
2014
- Project: Components and skids for various projects. Contractor / Employer: Bcube, Coniolo (AL), Italy. Supervised activities:Coatings application. Place: Bcube Massa and Livorno Plants, Italy
Final Client: Nuovo Pignone GE Oil & Gas.
2013 – 2014
- Project: Bukom ECG Cogen Project – Singapore. Contractor / Employer: Leucci, Brindisi, Italy. Supervised activities:Thermal spraying.Place: TSM Plants, Brindisi, Italy. Final Client: Shell Eastern Petroleum Ltd.
2011 – 2014
- Project: Gorgon Project Barrow Island LNG Plant – Fully Modularised Gas Turbine Generators. Modules 4001 to 4005. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Quarantine, Coatings application, QA / QC & Preservation. Place: NP Yard, Avenza (MS), Italy. Final Client: Chevron Australia.
2013
- Project: H2S Production Tanks. Contractor / Employer: 437 Srl, Bergamo, Italy. Supervised activities: Internal lining. Place: APM Facilities, Fier, Albania. Final Client: Petromanas Energy Inc. Canada.
2012 – 2013
- Project: Total E&P UK Laggan-Tormore Project. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: NP Yard, Avenza (MS), Italy. Final Client: Total EP UK
2010 – 2012
- Project: Gorgon Project Barrow Island LNG Plant – Fully Modularised Gas Turbine Generators. Modules 4001 to 4005. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Navalmare Yard, La Spezia, Italy. Final Client: Chevron Australia.
2011
- Project: Gorgon Project Barrow Island LNG Plant – Jetty. Contractor / Employer: Saipem, Milan, Italy. Supervised activities: Coatings application. Place: PT Hanjung, Lampung, Indonesia. Final Client: KJVG.
2010 – 2011
- Project: Capparuccia. Contractor / Employer: Demont, Millesimo (SV), Italy.
Supervised activities: Coatings application. Place: SA.V.IN., Castel dell’Aquila (TR), Italy. Final Client: Eni.
2010
- Project: USAN Deepwater Project – Top and Bottom Assembly.
Contractor / Employer: Saipem Energy Services, Arbatax (OG), Italy. Supervised activities: Coatings application. Place: S.E.S. Yard, Arbatax (OG), Italy. Final Client: Total.
2010
- Project: Bonaccia Est – Field joint. Contractor / Employer: IET, Genoa, Italy. Supervised activities: Piping rubber coating. Place: Micoperi MC – Adriatic See, Italy. Final Client: Eni.
2010
- Project: Capparuccia. Contractor / Employer: IET, Genoa, Italy. Supervised activities: Piping rubber coating. Place: Riveco, Larino (CB), Italy. Final Client: Eni.
2010
- Project: Heat Recoivery Steam Generator. Contractor / Employer: Impresa Donelli, Legnano, Italy. Supervised activities: Coatings application. Place: Gönyü Power Plant, Hungary. Final Client: EON.
2009 – 2010
- Project: 72 Headers (36 bundles) . Contractor / Employer: OLMI, Bergamo, Italy. Supervised activities: Coatings application & Thermal spraying. Place: TDM Plants, Vibo Valentia, Italy. Final Client: UHDE – Suiskil.
2005 – 2010
- Project: RGI Modules 1 and 2 for Kashagan Experimantal Project, Kazakhstan.
Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application, Tank lining, Fireproofing & Insulation. Place: Navalmare Yard, La Spezia, Italy. Final Client: AGIP KCO.
2009
- Project: Package quality verification.
Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: LNG Pampa Melchorita, Peru. Final Client: Nuovo Pignone GE Oil & Gas.
2009
- Project: S 355 C2 Stinger. Contractor / Employer: Nuova Olmec, Arcola (SP), Italy. Supervised activities: Coatings application. Place: Navalmare Yard, La Spezia, Italy. Final Client: Saipem.
2009
- Project: 2 Fluid Bed Cooler Casings e Granulator for Qafco-5. Contractor / Employer: Cemit, Taranto, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: Qatar Gas.
2008
- Project: Plant and Applicators quality verification. Contractor / Employer: OMA/Henson, Bucharest, Romania. Supervised activities: Coatings application. Place: Metacom Yard, Costanta, Romania. Final Client: OMA/Henson.
2008
- Project: GTG – Qatar Gas II. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy.
Supervised activities: Coatings application. Place: Ras Laffan Industrial City, Qatar Final Client: Qatar Gas.
2008
- Project: Scarabeo 8. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
Supervised activities: Coatings application. Place: Navalmare Yard, La Spezia, Italy
Final Client: Saipem.
2007 – 2008
- Project: Mega Yacht Serena. Contractor / Employer: BOAT, Genoa, Italy.
Supervised activities: Coatings application & Tank lining. Place: Fincantieri Plants, La Spezia, Italy.
Final Client: Fincantieri.
2006 – 2007
- Project: 310, 320 and 330 Modules for Adriatic LNG Project. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: NP Yard, Avenza (MS), Italy; Dragados Yard, Cadiz, Spain. Final Client: Exxon Mobil.
2006 – 2007
- Project: Filter House for Khurais Project, Saudi Arabia. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application & Tank lining. Place: Tallarini Plants, S. Ippolito (PU), Italy. Final Client: Saudi Aramco.
2006 – 2007
- Project: Woodside Phase V LNG. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Wooddide LNG, Karratha WA, Australia.
Final Client: Foster Wheeler Worley Parsons.
2005 – 2007
- Project: Tanks and vessels for Sabratha platform. Contractor / Employer: SICES, Porto Torres (SS), Italy. Supervised activities: Coatings application. Place: SICES Plants, Porto Torres (SS), Italy. Final Client: AGIP KCO.
2005
- Project: Module for Petrobras P34 FPSO. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: BR.
2005
- Project: Piping for Petrobras P54. Contractor / Employer: Cemit, Taranto, Italy. Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy. Final Client: BR.
2005
- Project: Sable Tier II Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
Supervised activities: Coatings application & Thermal spraying. Place: SVM Yard, Taranto, Italy . Final Client: Exxon Mobil.
2004 – 2005
- Project: Sable Tier II Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
Supervised activities: Coatings application & Thermal spraying. Place: Intermare Sarda Yard, Arbatax (NU), Italy. Final Client: Exxon Mobil.
2004 – 2005
- Project: West Espoir Jacket and Deck. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy. Final Client: CNR International.
2004
- Project: Piping for Beregovaja Comprassion Station, Russia. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy. Final Client: Saipem.
2004
- Project: East Area EPC2 – Modules GR1, GR2 e GR3. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy. Final Client: Exxon Mobil.
2004
- Project: Offshore oil traps. Contractor / Employer: C.I.B., Viggiano (PZ), Italy.
Supervised activities: Coatings application. Place: C.I.B. Yard, Viggiano (PZ), Italy. Final Client: AGIP.
2003 – 2004
- Project: Piping for Petrobras P50. Contractor / Employer: Cemit, Taranto, Italy.
Supervised activities: Coatings application. Place: Cemit Plants, Taranto, Italy.
Final Client: BR.
2003 – 2004
- Project: Sabratha Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy.
Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy.
Final Client: AGIP Gas BV.
2003 – 2004
- Project: Modules P05A and P05B for Petrobras P50 FPSO. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application & Thermal spraying.
Place: Nuovo Pignone Yard, Avenza (MS), Italy. Final Client: BR.
2003 – 2004
- Project: Structures for WAFA Coastal Gas Plant, Libya. Contractor / Employer: ICOM Engineering, Padova, Italy. Supervised activities: Coatings application. Place: TSM Plants, Brindisi, Italy.
Final Client: AGIP.
2002 – 2003
- Project: Modules LP96 and LP97 for Ampa Fairley Phase 2.. Contractor / Employer: Nuovo Pignone GE Oil & Gas, Florence, Italy. Supervised activities: Coatings application. Place: Nuovo Pignone Yard, Avenza (MS), Italy. Final Client: Shell Brunei.
2003
- Project: Package for Sabratha Platform. Contractor / Employer: SICES, Porto Torres (SS), Italy.
Supervised activities: Coatings application. Place: SICES Plants, Porto Torres (SS), Italy.
Final Client: AGIP Gas BV.
2003
- Project: Structures for WAFA Coastal Gas Plant, Libya. Contractor / Employer: ISG, Milano, Italy. Supervised activities: Coatings application. Place: Various Yards in Italy. Final Client: AGIP.
2002
- Project: Verification of application standards. Contractor / Employer: Volga International, Genoa, Italy. Supervised activities: Coatings application. Place: Vietsovpetro Plants, Vung Tau, Vietnam. Final Client: Volga International.
2002
- Project: Storage Tanks in ASAB Plant. Contractor / Employer: Snamprogetti, Milan, Italy. Supervised activities: Tank lining. Place: ASAB Gas Plant, Abu Dhabi, UAE. Final Client: ADNOC.
2002
- Project: Modules P05A and P05B for Petrobras P50 FPSO. Contractor / Employer: Snamprogetti, Milan, Italy. Supervised activities: Coatings application. Place: Sidermontaggi Yard, Taranto. Final Client: BR.
2002
- Project: Verification of RoRo Maltese Falcon. Contractor / Employer: Sea Malta Company, Malta. Supervised activities: Coatings application. Place: Drydocks, Marsa, Malta. Final Client: Sea Malta Company.
2000 – 2002
- Project: Oiltanking Malta Tank farm. Contractor / Employer: Oiltanking Malta, Malta. Supervised activities: Coatings application & Tank lining. Place: B’Bugia Freeport, Malta. Final Client: Oiltanking Malta.
2001
- Project: Verification of Foukanda and Mwafi Decks. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: AGIP Offshore Fields, Congo. Final Client: AGIP Congo.
2000 – 2001
- Project: Foukanda and Mwafi Decks. Contractor / Employer: SVM, Tortolì (NU), Italy. Supervised activities: Coatings application. Place: IntermareSarda Yard, Arbatax (NU), Italy. Final Client: AGIP Congo.
2000
- Project: Sewage Water Treatment Plant. Contractor / Employer: Gemmo Impianti, Vicenza, Italy.
Supervised activities: Tank lining. Place: NATO Base, La Maddalena (SS), Italy.
Final Client: NATO.
1999 – 2000
- Project: Vessels for Riyadh-Qassim WTS/St. 4. Contractor / Employer: Tuboveritas, Milan, Italy. Supervised activities: Coatings application & Tank lining. Place: TSM Plants, Brindisi, Italy. Final Client: SSWCC.
1998 – 1999
- Project: Bouri Phase 2 – USV-Skid. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy.
Final Client: AGIP.
1998 – 1999
- Project: Annalisa Jacket. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application. Place: Intermare Sarda Yard, Arbatax (NU), Italy.
Final Client: AGIP.
1998 – 1999
- Project: Åsgard B TLP – Module M20. Contractor / Employer: Intermare Sarda, Arbatax (NU), Italy. Supervised activities: Coatings application, Fireproofing & Insulation. Place: Intermare Sarda Yard, Arbatax (NU), Italy. Final Client: Statoil.
1998
- Project: Marlin TLP. Contractor / Employer: SMT, Massafra (TA) Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Amoco.
1996 – 1998
- Project: Ursa TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.
1997
- Project: Modules P15, P16, P35 and P36 for Åsgard A FPSO. Contractor / Employer: Belleli Offshore, Taranto, Italy. Supervised activities: Coatings application & Thermal spraying . Place: Belleli Plants, Siracusa, Italy. Final Client: Statoil.
1993 – 1997
- Project: Flue Gas Desulphuration Plant for ENEL Brindisi Sud. Contractor / Employer: APSA, Milan, Italy. Supervised activities: Coatings application & Mat lining. Place: ENEL Power Station, Brindisi Final Client: ENEL.
1995 – 1996
- Project: Storebaelt Bridge. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy.
Final Client: Coinfra.
1995 – 1996
- Project: Ram/Powell TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.
1994 – 1995
- Project: Njord TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Aker.
1994 – 1995
- Project: Mars TLP. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.
1993 – 1994
- Project: Modules M30 and M40 for Hibernia Platform. Contractor / Employer: Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Hibernia.
1991 – 1993
- Project: Auger TLP. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Shell.
1991 – 1992
- Project: Modules for Scott Field. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Amerada-Hess.
1989 – 1990
- Project: Snorre TLP. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Statoil.
1989
- Project: Olimpico Stadium covering structures. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Belleli.
1988
- Project: Meazza Stadium covering structures. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Belleli.
1987 – 1988
- Project: Agbara Jacket, Deck and Flare. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: Saipem.
1987 – 1988
- Project: Modules M16 and M17 for Gullfaks C Platform. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application & Tank lining. Place: Belleli Plants, Taranto, Italy. Final Client: Statoil.
1986 – 1987
- Project: DP-3 Jacket and Flare. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: AGIP.
1985 – 1986
- Project: DP-4 Jacket. Contractor / Employer: Beraud Sud, Milan, Belleli, Mantova, Italy. Supervised activities: Coatings application. Place: Belleli Plants, Taranto, Italy. Final Client: AGIP.